工期是什么意思_工期的翻译_读音_造句_例句

工期

[gōng qī]

na.time limit for a project

网络释义:Duration; project duration; construction period

汉英

网络释义

na.1.time limit for a project

1.Duration construction cycle 建设周期 construction period 工期 construction stage 建造阶段 ...

4.time limit for a project ... 工棚[ work shed] 工期[ time limit for a project] 工巧[ exquisite;fine;skilful] ...

5.work period ... 资金 fund 工期 work period 质量 quality ...

6.Schedule 质量( QUALITY) 工期( SCHEDULE) 安全( SAFETY) ...

7.Period10 1.11 1.12 13.13 说明 定义 工期period)的计算 工程现场 接受现有的现场 合同范围 分包合同范围 涉及建筑施工的 MEP …

8.time for completion ... 2.0.58 分包合同 subcontract 2.0.59 工期 time for completion 2.0.60 缺陷通知期限 defects notification period ...

造句带翻译释义:,time limit for a project,Duration,project duration,construction period

1.Any task with zero duration is automatically displayed as a milestone; you can also mark any other task of any duration as a milestone.任何工期为零的任务都自动显示为里程碑,也可以将具有任意工期的其他任务标记为里程碑。

2.How much is the total duration claim?总计工期索赔是多少天?

3.But in the actual project management, schedule is often delayed.但在实际的项目管理中,工期拖延的情况时常发生。

4.Building a rooftop extension from prefabricated units is less disruptive than constructing it on site, which can take up to a year.用预制单元盖屋顶房比就地盖房破坏性要小得多,而且后者工期要花上一年时间。

5.The construction of the trail part began in last August and is expected to be finished in 10 months. So far the working goes well.合肥轨道交通一号线试验段自去年8月开工,预计工期10个月,目前工程进展顺利。

6.Or , if you need to cut costs to meet your budget , you might have to decrease scope by cutting tasks or reducing task durations .或者,在需要削减成本以满足预算时,您不得不通过减少任务或缩短任务工期来缩小范围。

7.The Saudi Bin Laden Group (SBG), whose offer was the most attractive in terms of price, quality and schedule, was chosen for the project.沙特本拉登集团(SBG)的报案在价格,质量和工期是最有吸引力的,被选择负责该工程。

8.Furthermore, the project duration is usually specified and the contractor must abide by the deadline for completion.此外,项目工期通常是明确规定的,承包商必须按期限完成工程。

9.these latter two types of links automatically overlap tasks , which tends to decrease the overall project duration.后两种链接类型自动地重叠任务,这将趋于缩短项目的总工期。

10.No final review shall result in a decrease of any extension of time already determined by the Engineer.终审结果不应导致减少工程师业已决定的任何延长工期的时间。

1/3    1 2 3