敷设是什么意思_敷设的翻译_读音_造句_例句

敷设

[fū shè]

na.lay; rough in

网络释义:laying; laid; installing

汉英

网络释义

na.1.lay; rough in

1.lay 敷料[ dressing] 敷设[ lay] 敷霜[ blooming] ...

2.laying 缝隙 slit,spacing 敷设 laying 伏特 volt ...

3.laid ... lagging 防护套;保温包扎 laid 敷设;铺砌 laitance 浆沫 ...

4.installing ... 装置,配置;设备,零件: gadget 装置,敷设installing 装在同轴管中的偶极天线: sleeve ant…

5.weize Weir's pump 韦尔配汽门往复泵 weize 敷设;航路绘算;垫片 weize 敷设航路绘算垫片 ...

6.laying up ... n^ laying angle^ 成缆角^^ n^ laying up^ 绞缆|成缆|线芯绞合|敷设^^ n^ laying up drum twister^ 盘式成缆机 ^^ ...

7.Riser Application器的口上用布(ras)罐(lting,ltir?)敷设bting-ba),把患者放在其上面,熏蒸或泡在如温泉一样的[药液]中。

造句带翻译释义:,lay,rough in,laying,laid,installing

1.For laying indoor, tunnel, canal and underground. Able to bear external mechanical forces, but unable to bear large pulling force.适用于室内、隧道、电缆沟及地下直埋敷设。电缆能承受机械外力作用,但不能承受大的拉力。

2.In tunnel , in cable trench or direct in ground , able to bear external mechanical forces, but unable to bear large pulling force .适用于埋地敷设,能承受机械外力作用,但不能承受过大的拉力。

3.The use of the overhead power line corridors and towers were set up in line is a very economical way of cable lying.利用架空电力线路走廊,在线路杆塔上进行架设,是一种非常经济的光缆敷设方式。

4.As far as practicable , all cables between antennas and transmitters are to be routed off any other cable.假如可实行,天线和变送器间的所有电缆的敷设应阔别其他电缆。

5.In some regions, due to such factors as terrain, traffic, etc. it is unavoidable that two or more oil or gas pipelines are laid in parallel.在部分地区,由于受管道沿地形、交通等条件的制约,两条及以上的管道进行伴行敷设的情况将不可避免。

6.Installed in shaft, under water and soil with great drop, able to bear external mechanical forces and moderate pulling force.敷设在竖井、水下及具有落差条件下的土壤中,电缆能承受机械外力作用的相当拉力。

7.For laying indoors, in trenches , in ducts and in ground able to withstand heavier mechanical force , and for fixed installation.敷设在室内、电缆沟、管道、直埋等承受较大机械外力的固定场合。

8.and finally, the creation of a pedestrian link between the paths of the upper and lower levels that border this lot.以及在地块边缘敷设行道并在高差较大出设置踏步相衔接的作法。

9.In tunnel or cable trench , unable to bear external mechanical forces . Single- core cable in magnetic duct is not permissible.隧道及电缆等场所,不能承受机械外力。单芯电缆不允许敷设在磁性管道中。

10.The mathematics model can help system planner to predict the maximum throughput of a pipeline to be built.该数学模型有助于决策者根据战场情况预知将要敷设的管道可能达到的输送量。

1/3    1 2 3